Shivamogga: 7,300 cusecs water released from Tunga dam
Team Udayavani, Jun 14, 2021, 4:29 PM IST
Shivamogga: An engineer of the Upper Tunga project, Harish informed that 7,300 cusecs of excess water was released on Monday, June 14 from Tunga dam in Gajanuru village of Shivamogga following an increase in water levels due to heavy rainfall.
“Through crest gates, 1,500 cusecs and through the powerhouse, 5,800 cusec water has been released. 21 gates were opened to remove the excess water,” said Harish, an engineer of the Upper Tunga project.
He further said, “Tunga dam which is built across river Tunga in Gajanuru village of Shivamogga had filled up to the brim. The dam was overbrimming due to downpour in its catchments areas in Chikkamagaluru and Shivamogga.”
Comparatively, the Tunga dam is a small one, constructed to provide drinking water to Shivamogga and for canal irrigation of paddy and areca nuts in the region, he added.
Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.
Top News
Related Articles More
Kukke Subrahmanya Temple: Changes to Seva timings until December 12
VHP’s saint congregation resolves to fight against ‘Waqf Board land claims’
Puttur: Two arrested for misconduct under influence of drugs
Kaup: Massive campaign and awareness rally Nov 26 for Constitution protection
Have won in people’s court, says Karnataka CM Siddaramaiah on by-poll results
MUST WATCH
Latest Additions
Kukke Subrahmanya Temple: Changes to Seva timings until December 12
COP29: India rejects new USD 300 billion climate finance deal
Maharashtra Assembly Elections 2024 | Congress chief Nana Patole scrapes through in Sakoli, wins by 208 votes
Waqf land dispute: Kerala CM assures no body will be evicted from Munambam
Government launches Haj Suvidha App 2.0 for ease of pilgrims
Thanks for visiting Udayavani
You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.