Bengaluru: Police quarter building tilts due to wide crack
Team Udayavani, Oct 16, 2021, 7:06 PM IST
Bengaluru: Newly built seven-floored police quarters along Magadi Road has been dangerously tilted by 1.5 feet due to a wide crack, on Saturday, October 16.
The policemen, who along with fire brigade personnel, are generally involved in evacuating families from the houses that collapsed in the recent past in Bengaluru, were themselves forced to be evacuated as a crack in the building now developed into a wide gap forcing the structure to tilt.
As many as 38 families residing in the ‘B’ block building have been evacuated as authorities do not want to take any chances with their safety. It is also being contemplated to shift families from ‘C’ block building as well. Sources said the evacuated families will be sent to Annapoorneshwari Nagar police quarters.
The ‘B’ block building which has tilted is posing danger to the ‘C’ Block building as well. Sources say that poor quality of construction work has resulted in tilting of the building.
The police quarters were allotted in 2020 to families of policemen working in Bengaluru and the construction work of this apartment complex was completed three years ago.
The residents said Bengaluru Police Commissioner, Kamal Pant had visited the police quarters last week and was told about the condition of the building.
BBMP Chief Commissioner, Gaurav Gupta said the tilt is found in the police quarters. “The building was built using Japanese technology. The construction is being done with cement blocks. There is no beam installed between blocks and they are not supported well. The information is that the building is constructed three years ago and there is a six-and-a-half inch crack, “he added.
The latest survey was ordered by BBMP after a series of incidents of the collapse of old and weak buildings in the city due to incessant rains were reported. The families have had a narrow escape in at least three such incidents.
The latest survey has revealed that among 404 weak buildings, the highest number of such buildings are in the south zone at 103 followed by the west zone at 95. Structural engineers are going to assess these buildings and further decision will be taken based on their assessment.
(With inputs from IANS)
Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.
Top News
Related Articles More
Bantwal: Three arrested in Thumbe temple theft case
Bengaluru: BBMP garbage truck driver dies after tree branch falls on him
Six junior artists of Kannada film ‘Kantara’ injured in accident in Karnataka
Karnataka HC rejects plea to quash FIR in Rs 69 lakh Amazon scam case
Bengaluru: Man sustains severe leg injuries after being hit by car while sitting outside his house
MUST WATCH
Latest Additions
Rapid digital expansion to create over 1 lakh new jobs in fiber tech in India in next 5 years
Burglars decamp with cash Rs 1 crore, 300 gold sovereigns from house in Kerala
No ‘formula’ under discussion for CM’s post: Ajit Pawar
Raut demands re-election, alleges irregularities in EVMs during Maharashtra polls
Raut demands re-election, alleges irregularities in EVMs during Maharashtra polls
Thanks for visiting Udayavani
You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.