Puttur: Traffic affected on NH near Uppinangady after container trucks get stuck in mud-filled drain
Team Udayavani, May 24, 2022, 9:50 AM IST
Vehicular movement on national highway near Uppinangady here was affected for over three hours two container trucks reportedly got stuck in a slushy mud-filled drain on Monday May 23.
Recently during the four-laning work of NH, the workers did not clear the mud after digging up the road. This mud made its way into the roadside drain owing to the heavy rains.
On Monday, a container truck traversing on this path got stuck in the slush-filled drain while giving passage to another vehicle. Meanwhile another truck too got stuck while trying to pass ahead of this container.
Later crane was deployed to move the containers. Locals say that a similar incident took place last month too but the contractor is not bothered about the problem.
Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.
Top News
Related Articles More
Bhadravathi: Seven injured in boiler explosion at rice mill
Allegation of abuse against K’taka Minister Laxmi: BJP leader C T Ravi booked, taken into custody
Gadag: 2-yo girl dies after being run over by water tanker
Mangaluru Traffic Advisory: Netravathi Bridge repair work to affect vehicle movement
MUDA case: Karnataka HC defers filing of Lokayukta police report
MUST WATCH
Latest Additions
Bhadravathi: Seven injured in boiler explosion at rice mill
Strict provisions of law for women’s welfare; marriage not commercial venture: SC
Allegation of abuse against K’taka Minister Laxmi: BJP leader C T Ravi booked, taken into custody
Gadag: 2-yo girl dies after being run over by water tanker
Mangaluru Traffic Advisory: Netravathi Bridge repair work to affect vehicle movement
Thanks for visiting Udayavani
You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.