Bantwal: Lorry gets stuck under railway over-bridge
Team Udayavani, Feb 13, 2024, 11:57 AM IST
A lorry, carrying a roller vehicle, got stuck under a railway overbridge near Moodankapu at BC Road on Tuesday morning around 9 am.
The lorry was transporting the assets of a construction firm to the work site at Puttur’s Savanur.
It is gathered that the load on the lorry exceeded the height clearance of the bridge, causing it to get stuck. An iron pillar, erected near the overbridge, belonging to the railway department was damaged in the incident.
Fortunately, the incident did not result in any casualties or harm to other vehicles.
Vehicular traffic was disrupted on the road following the mishap.
The railway authorities and traffic police personnel rushed to the scene to assess the situation. A crane was deployed to move the lorry aside, allowing normal traffic movement to resume.
Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.
Top News
Related Articles More
Karnataka govt plans for 19,000 MW power demand, ensures no load-shedding this summer
Six surrendered naxals produced before NIA court
Delhi Police arrests two sharpshooters of Nandu Gang from Bangalore
No confusion in Karnataka Congress: Minister Parameshwara
M. Mahesh Hegde Molahalli elected as new president of Molahalli Agricultural Service Cooperative Society
MUST WATCH
Latest Additions
Karnataka govt plans for 19,000 MW power demand, ensures no load-shedding this summer
HC initiates contempt proceedings against LDF, Congress leaders over road blockages for meetings
Adani-ISKCON to start ‘Mahaprasad Seva’ in Maha Kumbh
Six surrendered naxals produced before NIA court
A milestone in biotechnology research: PM Modi unveils genome sequencing data of 10,000 Indians
Thanks for visiting Udayavani
You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.