Bengaluru metro’s green line extension to be opened for commercial operation on Nov 7


PTI, Nov 6, 2024, 4:14 PM IST

Bengaluru: The 3.14 km stretch of Bengaluru’s Namma Metro Green Line extension from Nagasandra to Madavara will be opened for commercial operation on November 7, officials said on Wednesday.

The move comes after it received statutory clearance following a thorough inspection of the stretch by the Commissioner of Metro Railway Safety (Southern Circle) on October 3.

On Wednesday, Karnataka Deputy Chief Minister D K Shivakumar inspected the metro line and took a test run of the stretch from Nagasandra to Madavara by travelling from Yeshwanthpur Metro Station. He was also joined by Bengaluru South MP and BJP leader Tejasvi Surya.

According to Bangalore Metro Rail Corporation Limited (BMRCL), this line, an elevated metro corridor under Phase-2 of the Project, is from Nagasandra to Madavara (BIEC) for a length 3.14 km and consists of three metro stations — Majunathanagar, Chikkabidarakallu and Madavara (BIEC). It is completed at a cost of Rs 1,168 crore which includes land cost of Rs152 crore.

“It is the smallest extension to Phase-1 under Phase-2 of the Project. With completion of this extension, all the extensions to Phase- 1 under Phase-2 of the project are complete,” the BMRCL said in a statement.

Running along the National Highway, it crosses the NICE (Nandi Infrastructure Corridor Enterprises) road at two locations. This extension line will enhance easy metro access to the Bangalore International Exhibition Centre (BIEC), a major exhibition hub, large residential complexes and nearby towns thereby saving travel time to an extent of 30 per cent, it said.

“It is estimated that with this line opening, an additional 44,000 passengers will be benefitted. This extension will provide direct metro access to BIEC which is a major centre for National and International conferences and exhibitions in Karnataka,” the BMRCL stated.

“On commissioning of this section, Bengaluru will have 76.95 km of Metro network with 69 stations. North South corridor (Green Line) will become 33.46 km long with 31 stations and East West corridor (Purple Line) is 43.49 km long with 38 stations,” the BMRCL added.

Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.

Top News

US election result: Elon Musk leads meme brigade on social media

Spotlight on Usha Chilkuri Vance, Indian-American wife of new US VP-elect

Niveus Mangaluru Marathon 2024: City police issue traffic advisory for Nov 10

MUDA case: BJP calls Lokayukta police interrogating Siddaramaiah ‘match fixing’

BMTC bus driver dies of heart attack mid-route; conductor steps in to prevent mishap

Miraculous survival: Two months on, abandoned newborn conquers 50 wounds, animal bite in UP

Mumbai cops arrest man from Karnataka for threat message to Salman Khan

Related Articles More

Bommai demands probe into official’s death in Belagavi

Niveus Mangaluru Marathon 2024: City police issue traffic advisory for Nov 10

Udupi District BJP protests against state govt over Waqf Board’s alleged ‘land jihad’

Udupi: Standing stone discovered near Baje Dam

Bantwal: Scooter-bus collision — Death toll rises to 2

MUST WATCH

Gho Pooja in Deepavali Festival

Melukote Deepavali

Ganapathi Co-operative Society Ltd

Udayavani Chinnara Banna 2024

Annapoorna Aahar | Food Places In Mysore


Latest Additions

Bommai demands probe into official’s death in Belagavi

US election result: Elon Musk leads meme brigade on social media

Chennai Grand Masters: Arjun holds Aronian to draw; Vaishali earns first points

Spotlight on Usha Chilkuri Vance, Indian-American wife of new US VP-elect

Niveus Mangaluru Marathon 2024: City police issue traffic advisory for Nov 10

Thanks for visiting Udayavani

You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.