Supplied 80% steel required for Sardar Sarovar Project: SAIL


Team Udayavani, Sep 18, 2017, 9:22 AM IST

New Delhi : State-owned SAIL today said it has supplied 80 percent steel required for the construction of Sardar Sarovar Project, inaugurated by Prime Minister Narendra Modi.

“Once again partnering in one of the most prestigious and important national projects, Steel Authority of India Ltd (SAIL) has supplied 80 percent steel required for construction of the Sardar Sarovar Project inaugurated by Prime Minister Narendra Modi today,” the public sector firm said in a statement.

SAIL supplied around 85,000 tonnes of steel (TMT) for the entire Sardar Sarovar Narmada Nigam Ltd (SSNNL) project which comprises all the canals throughout Gujarat which are connected to Narmada River and Dam, the statement said. The Sardar Sarovar project is the second largest concrete gravity dam (by volume) and has the world’s third-largest spillway discharging capacity.

The Sardar Sarovar Dam is a gravity dam built on Narmada river near Navagam, Gujarat, which will benefit four states — Gujarat, Madhya Pradesh, Maharashtra and Rajasthan, the company said. A part of the Narmada Valley Project, it will help in irrigation and electrical power supply.

The company said it is a part of a large hydraulic engineering project, involving the construction of a series of large irrigation and hydroelectric multi-purpose dams on the Narmada river. One of the 30 dams planned on river Narmada, Sardar Sarovar Dam (SSD) is the largest structure to be built.

“The project will irrigate more than 18,000 m2 (190,000 sq ft), most of it in drought-prone areas of Kutch and Saurashtra. The total installed capacity of the power facilities is 1,450 MW,” the steel major said.

Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.

Top News

Lokayukta arrests Hassan Municipal Commissioner, Bengaluru official in bribery cases

NHRC notice to Centre, K’taka govt over ‘suicide’ by old man over hospital ‘denying’ scheme benefit

K’taka BJP leader slams Maoist surrender as ‘farce,’ accuses CM of embracing Maoist ideology

SpaDeX: ISRO says it arrested drift between satellites

India advocates ‘Budh’ over ‘Yudh’: PM Modi

Six surrendered naxals remanded to judicial custody till Jan 31

What is the solution for air pollution or do we continue to see haze every year: HC

Related Articles More

NHRC notice to Centre, K’taka govt over ‘suicide’ by old man over hospital ‘denying’ scheme benefit

Modi govt has made GST a means of ‘looting’ poor, middle class: Kharge

India advocates ‘Budh’ over ‘Yudh’: PM Modi

NRAI to file complaint against Zomato, Swiggy over ‘pvt labelling’, food delivery via separate apps

What is the solution for air pollution or do we continue to see haze every year: HC

MUST WATCH

| Elephant attack in kerala

How Scammers Trick People Using Phonepe App

Create Your Own Fertilizer

Thieves caught on camera

Tulunadu Daivaradane


Latest Additions

Lokayukta arrests Hassan Municipal Commissioner, Bengaluru official in bribery cases

NHRC notice to Centre, K’taka govt over ‘suicide’ by old man over hospital ‘denying’ scheme benefit

K’taka BJP leader slams Maoist surrender as ‘farce,’ accuses CM of embracing Maoist ideology

Postman injured in Bus-Bike collision near Aadidhan hotel near Mulki

K’taka BJP leader slams Maoist surrender as ‘farce,’ accuses CM of embracing Maoist ideology

Thanks for visiting Udayavani

You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.