ISRO eyes its 100th satellite
Team Udayavani, Jan 9, 2018, 5:27 PM IST
Bengaluru: India will launch ISRO’s 100th satellite along with 30 others in a single mission on January 12 from Sriharikota, in a milestone event in the country’s space history.
The Indian Space Research Organisation (ISRO) said it was “back in the game” with the launch, the first Polar Satellite Launch Vehicle (PSLV) mission after the unsuccessful launch of the navigation satellite IRNSS-1H in August last year.
“The 31 spacecraft, including weather observation Cartosat-2 series satellite, will be launched by PSLV-C40,” ISRO Satellite Centre (ISAC) director M Annadurai said today.
Stating that 28 of the satellites were from abroad, the official noted that the launch of three Indian satellites during the mission would mark the rollout of the hundredth satellite from ISRO.
“When the last satellite is ejected out it will become the hundredth satellite…the first century we have done. It is the maiden century. So PSLV-C40 marks the maiden century of Indian satellite. We are eagerly waiting for that,” he said.
Speaking to reporters on sidelines of an exhibition on ASTROSAT here, Annadurai said, “With PSLV-C40 we are back in the game”.
PSLV-C40 will launch the 710 kg Cartosat-2 series satellite for earth observation and 30 co-passengers (together weighing about 613 kg) at lift-off on January 12 at 09.28 am, ISRO said. It will be launched from the first launch pad of the Satish Dhawan Space Centre at Sriharikota, about 100 km from Chennai.
The co-passenger satellites include one micro and nano-satellite each from India. Three micro and 25 nano-satellites from six countries namely Canada, Finland, France, Republic of Korea, UK and USA, make up the other payload.
Referring to the PSLV-C39 failure, Annadurai said ISRO had understood it and repeated tests had been conducted to ensure that such problems did not reoccur. This took slightly more time for PSLV-C40 launch.
On August 31, India’s mission to launch its backup navigation satellite IRNSS-1H on board PSLV-C39 failed after a technical fault on the final leg following a perfect launch.
ISRO then said the heat shield did not separate on the final leg of the launch sequence and, as a result, IRNSS-1H got stuck in the fourth stage of the rocket.
The total weight of all the 31 satellites carried on board PSLV-C40 is about 1,323 kg.
According to ISRO, Cartosat-2 series satellite launch is a follow-on mission with the primary objective of providing high-resolution scene-specific spot imageries. It carries panchromatic and multi-spectral cameras operating in Time Delay Integration mode and is capable of delivering high-resolution data.
This will be the third satellite in the Cartosat-2 series.
On plans for the year, Annadurai said Chandrayaan-2 was in the final stage of testing and integration of the orbiter, lander and rover, and was expected for launch this year. Also, IRNSS-1I, a follow-on satellite will be the first satellite whose assembly, integration and testing will be fully done by private industry, he said, adding “we are enabling the private industry”.
On GSAT-11, a six-tonne class communication satellite, he said, was at the final leg of testing, and the launch target was April.
Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.
Top News
Related Articles More
Musk says X now top news app on App Store in India
Air India to offer integrated aircraft maintenance engineering programme
Markets stage sharp recovery; Sensex reclaims 79k level, Nifty surges 557.35 points
Baku climate talks: The ‘X’ factor that could determine future of Global South
Kidnapped for ransom in 1998, 26/11 survivor Gautam Adani faces biggest trial
MUST WATCH
Latest Additions
Musk says X now top news app on App Store in India
Delhi court stays defamation case against CM Atishi
Sambhal Jama Masjid row: Friday prayers held peacefully amid tight security
Honouring ex-NASA scientist’s last wish, family donates ancestral house to Meerut varsity
Decide on disqualification petitions against BRS MLAs in reasonable time: HC
Thanks for visiting Udayavani
You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.