Chandrayaan 2’s Vikram hard-landed within 500 meters of landing site: Govt
PTI, Nov 21, 2019, 9:12 AM IST
New Delhi: Chandrayaan-2’s Vikram lander hard-landed as reduction in velocity during its descent did not match with the designed parameters, the government said on Wednesday throwing more light on ISRO’s dashed hopes of making a soft landing on the lunar surface in its maiden attempt.
In a written reply to a question in the Lok Sabha, Jitendra Singh, the minister of state in the Prime Minister’s Office, who looks after the department of space, said the first phase of descent was performed nominally from an altitude of 30 kms to 7.4 kms above the moon’s surface and velocity was reduced from 1,683 metres per second to 146 metres per second.
“During the second phase of descent, the reduction in velocity was more than the designed value. Due to this deviation, the initial conditions at the start of the fine braking phase were beyond the designed parameters. As a result, Vikram hard-landed within 500 metres of the designated landing site,” he said.
Singh, however, said most components of technology demonstration, including the launch, orbital critical manoeuvres, lander separation, de-boost and rough braking phase were successfully accomplished.
With regards to the scientific objectives, all the eight state-of-the-art scientific instruments of the orbiter are performing according to the design and providing valuable scientific data. Due to the precise launch and orbital manoeuvres, the mission life of the orbiter is increased to seven years, he said.
Data received from the orbiter is being provided continuously to the scientific community, he said, adding the same was recently reviewed in an all-India user meet organized in New Delhi.
The indigenously developed Chandrayaan-2 spacecraft comprising of orbiter, lander and rover was successfully launched on-board the indigenous GSLV MK III-M1 Mission on July 22.
After accomplishing four Earth bound manoeuvres and trans-lunar injection, the spacecraft was successfully inserted in the lunar orbit on August 20. A series of moon-bound manoeuvres were then carried out to achieve a Lunar orbit of 119 x 127 km.
The Lander ‘Vikram’ was separated, as planned, from the Orbiter on September 2 2019. After two successful de-orbiting manoeuvres, powered descent of the lander was initiated on September 7 to achieve soft landing on the moon surface.
The ISRO is planning to launch Chandrayaan-3 probably in November next year.
Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.
Top News
Related Articles More
Air pollution: SC flags Delhi govt’s failure to implement GRAP-4 curbs on entry of trucks
Baba Siddique murder: Man held from Akola, 26th arrest in case
SC notice to Gyanvapi mosque committee on plea for ASI survey of ‘shivling’ area
Delhi court stays defamation case against CM Atishi
Sambhal Jama Masjid row: Friday prayers held peacefully amid tight security
MUST WATCH
Latest Additions
Air pollution: SC flags Delhi govt’s failure to implement GRAP-4 curbs on entry of trucks
Drugs worth Rs 6 crore seized in Bengaluru, five arrested
Siddaramaiah urges Nirmala Sitharaman to address NABARD’s loan cuts to farmers
Satwik-Chirag enter semifinals, Lakshya loses to Antonsen in China Masters
BJP stages protest against Congress govt in Karnataka over Waqf properties row
Thanks for visiting Udayavani
You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.