Mangaluru: Repair works undertaken at Pumpwell flyover
Team Udayavani, Apr 30, 2020, 2:51 PM IST
Mangaluru: Repair works have been undertaken at Pumpwell flyover after cracks appeared at three places, including the protective wall on the bridge.
The Pumpwell flyover, that inspired several memes took about 10 years for completion, but the cracks appeared just three months after its inauguration.
The cracks started to appear after the unseasonal rains that lashed the city on Saturday, April 25.
Project director Shishu Mohan said hairline cracks appeared as the strengthening of the embankment, protection walls and flyover ramps had to be stopped due to the lockdown.
The district Congress meanwhile has alleged irregularities in the construction of the flyover and urged NHAI officials to conduct a probe.
Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.
Top News
Related Articles More
Puttur: Engineer translocates trees instead of chopping them down
Cong may crack whip against Khan for his ‘racist’ slur against Kumaraswamy, indicates Paramaeshwara
Sagara: Deer meat seized from Karnataka Rakshana Vedike leader’s house
Father and two sons drown in Ghataprabha river; search operations underway
B’luru: Thief arrested for daylight robbery: Gold and cash worth Lakhs recovered
MUST WATCH
Latest Additions
Puttur: Engineer translocates trees instead of chopping them down
Sensex drops 241 pts, Nifty falls for 7th day on selling in IT, oil shares
Mahayuti govt rushed to approve Adani Group projects ahead of Maharashtra poll announcement: Congress
As Delhi chokes with dangerous pollution levels, doctors warn of health risks for all
Cong may crack whip against Khan for his ‘racist’ slur against Kumaraswamy, indicates Paramaeshwara
Thanks for visiting Udayavani
You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.