Approaching storm may delay launch try for NASA moon rocket
PTI, Sep 24, 2022, 9:12 AM IST
An approaching storm threatens to delay NASA’s next launch attempt for its new moon rocket, already grounded for weeks by fuel leaks.
A tropical depression in the southern Caribbean is moving toward Florida and could become a major hurricane. Managers on Friday declared that the rocket is now ready to blast off on its first test flight, after overcoming more hydrogen leaks during a fuelling test earlier in the week. It will be the first time a crew capsule orbits the moon in 50 years; the spacecraft will carry mannequins but no astronauts.
Teams will keep monitoring the forecast and decide no later than Saturday whether to not only delay the test flight, but haul the rocket off the pad and back to the hangar. It’s unclear when the next launch attempt would be — whether October or even November — if the rocket must seek shelter indoors.
The preference is to remain at the launch pad and try for a Tuesday liftoff, ”but there are still some uncertainties in the forecast,” said NASA’s Tom Whitmeyer, deputy associate administrator for exploration systems.
It takes three days of preparations to get the rocket back into Kennedy Space Center’s mammoth Vehicle Assembly Building, a 4-mile (6.4-kilometer) trip lasting several hours.
”I don’t think we’re cutting it close,” Whitmeyer told reporters. ”We’re just taking it a step at a time.” The 98-metre rocket can withstand gusts of 137 kmph at the pad, but only 74 kmph once it’s on the move.
This would be the third launch attempt for the Space Launch System rocket, the most powerful ever built by NASA. Fuel leaks and other technical problems scrapped the first two tries, in late August and early September.
Although hydrogen fuel seeped past newly installed seals during Wednesday’s dress rehearsal, the launch team got the leakage down to acceptable levels by slowing the flow and reducing the pressure in the lines. That gave the launch team the confidence to proceed with a Tuesday launch attempt, officials said.
Managers said that the 30-year space shuttle program also saw plenty of hydrogen fuel leaks and hurricane-related rollbacks. The moon rocket’s main engines are actually upgraded versions of what flew on shuttles.
Also, the Space Force has extended the certification of on-board batteries that are part of the flight safety system — at least through the beginning of October.
NASA has just two chances to launch the rocket — Tuesday and October 2 — before a two-week blackout period begins. The next launch period would open October 17.
Astronauts would climb aboard for the second test flight around the moon in 2024. The third mission, targeted for 2025, would see a pair of astronauts landing on the moon.
Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.
Top News
Related Articles More
Don’t trust caller ID info; can be spoofed easily: Cyber advisory to govt officials
Stay Safe Online: Tips to avoid cyber fraud!
Three Chinese astronauts enter space station after successful launch
What is AI superintelligence? Could it destroy humanity? And is it really almost here?
IIT-B develops method to maintain comfortable temperature inside homes in joint research
MUST WATCH
Latest Additions
No greater feeling than serving those in need: Outgoing CJI D Y Chandrachud
Baikampady: Here, even elederly have to crawl under trains to cross tracks!
CJI Chandrachud: A legacy of landmark verdicts that shaped society and some controversy too
Neeraj Chopra to head to South Africa for off-season training later this month
Sensex, Nifty fall for 2nd day on FII selling; RIL, ICICI Bank major drag
Thanks for visiting Udayavani
You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.