Bantwal: Truck gets stuck in river bed during construction work
Team Udayavani, Nov 16, 2022, 11:23 AM IST
Bantwal: A truck that was transporting mud, got stuck in the Netravati river following a sudden rise in the water level on Tuesday, November 15.
It is said that the truck was involved in new bridge construction works and a temporary road had been constructed for the movement of trucks.
However, on Tuesday due to a sudden rise in the water level, mud on one side of the temporary road got washed away and the truck got stuck in the river.
The vehicle was later moved to another side using a JCB Machine.
Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.
Top News
Related Articles More
Mangaluru: Cyber frauds posing as TRAI representatives fleece Rs 1.71 crore
10 month baby gets new heart, new life
Saura Swasthya launched: Karnataka to power 5,000 health facilities with solar energy
Siddaramaiah says confident of winning all three bypolls in Karnataka
Hop on! IT Minister Priyank Kharge checks out Uber Shuttle at Bengaluru Tech Summit
MUST WATCH
Latest Additions
Mangaluru: Cyber frauds posing as TRAI representatives fleece Rs 1.71 crore
10 month baby gets new heart, new life
Saura Swasthya launched: Karnataka to power 5,000 health facilities with solar energy
India-US ties have strong foundation: White House confident in navigating crisis over Adani bribery charges
PM Modi leaves for home after concluding three-nation visit
Thanks for visiting Udayavani
You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.