Bengaluru metro’s green line extension to be opened for commercial operation on Nov 7


PTI, Nov 6, 2024, 4:14 PM IST

Bengaluru: The 3.14 km stretch of Bengaluru’s Namma Metro Green Line extension from Nagasandra to Madavara will be opened for commercial operation on November 7, officials said on Wednesday.

The move comes after it received statutory clearance following a thorough inspection of the stretch by the Commissioner of Metro Railway Safety (Southern Circle) on October 3.

On Wednesday, Karnataka Deputy Chief Minister D K Shivakumar inspected the metro line and took a test run of the stretch from Nagasandra to Madavara by travelling from Yeshwanthpur Metro Station. He was also joined by Bengaluru South MP and BJP leader Tejasvi Surya.

According to Bangalore Metro Rail Corporation Limited (BMRCL), this line, an elevated metro corridor under Phase-2 of the Project, is from Nagasandra to Madavara (BIEC) for a length 3.14 km and consists of three metro stations — Majunathanagar, Chikkabidarakallu and Madavara (BIEC). It is completed at a cost of Rs 1,168 crore which includes land cost of Rs152 crore.

“It is the smallest extension to Phase-1 under Phase-2 of the Project. With completion of this extension, all the extensions to Phase- 1 under Phase-2 of the project are complete,” the BMRCL said in a statement.

Running along the National Highway, it crosses the NICE (Nandi Infrastructure Corridor Enterprises) road at two locations. This extension line will enhance easy metro access to the Bangalore International Exhibition Centre (BIEC), a major exhibition hub, large residential complexes and nearby towns thereby saving travel time to an extent of 30 per cent, it said.

“It is estimated that with this line opening, an additional 44,000 passengers will be benefitted. This extension will provide direct metro access to BIEC which is a major centre for National and International conferences and exhibitions in Karnataka,” the BMRCL stated.

“On commissioning of this section, Bengaluru will have 76.95 km of Metro network with 69 stations. North South corridor (Green Line) will become 33.46 km long with 31 stations and East West corridor (Purple Line) is 43.49 km long with 38 stations,” the BMRCL added.

Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.

Top News

We have evidence of BJP MLC Ravi using invective inside K’taka Legislative Council: CM Siddaramaiah

Maintain strong relations with all community outfits, don’t oppose their views: Cong’s Chennithala

SC asks HC, Maharashtra govt to evolve mechanism to ensure production of accused before trial courts

7 Indians among around 200 injured in German Christmas market attack

Gambhir Problems: He wants his team but will he get that?

From reel to real: Drug smuggler caught from theatre during ‘Pushpa 2’ show

Boxing Day Test: Fans wait for Kohli’s ‘Kingly’ outing at MCG

Related Articles More

We have evidence of BJP MLC Ravi using invective inside K’taka Legislative Council: CM Siddaramaiah

Kundapura: Jet ski overturns in rough sea; Rider missing

Bengaluru: Woman posing as politician’s associate loots 3 kg gold

Belagavi: Man drives tractor over brother over property dispute, arrested

Geethartha Chinthane 132: Philosophy is not for preaching but for practice

MUST WATCH

Tulunadu Daivaradane

Feeding Birds with Creative Paddy Art!

Areca Nut

HOTEL SRI DURGA BHAVANA

Harish Poonja


Latest Additions

We have evidence of BJP MLC Ravi using invective inside K’taka Legislative Council: CM Siddaramaiah

Diljit Dosanjh denies blocking AP Dhillon on social media

India beat Bangladesh by 41 runs to bag Women’s U19 T20 Asia Cup

Maintain strong relations with all community outfits, don’t oppose their views: Cong’s Chennithala

NCB busts international drug racket; 3 Nigerians among 4 held

Thanks for visiting Udayavani

You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.