Indian delegation in Pakistan for Indus commission meet


Team Udayavani, Mar 20, 2017, 10:57 AM IST

Lahore/New Delhi: A 10-member Indian delegation arrived in Lahore to take part in the meeting of the Permanent Indus Commission (PIC) beginning today in the Pakistani capital.

The delegation, which will take part in the two-day meeting, is led by India’s Indus Water Commissioner P K Saxena and comprises of Ministry of External Affairs officials and technical experts.

Senior Pakistani officials and Indian High Commission officials greeted the delegation at the Wagah border. Media personnel gathered at the Wagah border were not given access to the delegation.

The delegation later left for Islamabad by road amid high security. Ahead of the visit, an Indian government source told PTI that India is “always open” to discuss and resolve concerns Pakistan has over its projects under the Indus Waters Treaty (IWT) bilaterally.

The source, however, reiterated that there will be “no compromise” on India exploiting its due rights under the 57-year-old pact. However, the agenda for the meeting, taking place nearly six months after India decided to suspend talks on the pact in the wake of the Uri terror attack by Pakistan-based outfits, is yet to be finalised.

Asked whether the delay in reaching consensus over the agenda for the meeting will leave little time to resolve issues, the source replied in negative. “We always go into such meetings with optimistic mindset.. In the past too, there had been delays in finalising agenda for the meeting, yet solutions were achieved,” the source added.

The source also recalled how Pakistan’s concern over India’s Uri-II and Chutak hydroelectric projects were resolved seven years ago through discussions. Pakistan had raised objections over designs of 240 MW Uri-II and 44 MW Chutak projects, built in Baramulla and Kargil districts of Jammu and Kashmir respectively, saying these will deprive it of its water share under the pact.

However, at a meeting held here in May 2010, the neighbouring country withdrew objections after the Indian side provided details of these. Similarly, Pakistan has been flagging concern over designs of India’s five other hydroelectricity projects — Pakal Dul (1000 MW), Ratle (850 MW), Kishanganga (330 MW), Miyar (120 MW) and Lower Kalnai (48 MW) — being built or planned in the Indus river basin, contending these violate the treaty.

It had approached the World Bank, the mediator between the two countries of the 57-year-old water distribution treaty, in August last year raising issues over Kishanganga and Ratle projects in Jammu and Kashmir. While there is no clarity yet whether issues relating to these two projects will figure during the meet as they are before the Bank, the source said Pakal Dul, Miyar and Lower Kalnai may be discussed.

According to Pakistan, designs of the three projects are not in line with the treaty, whereas India has maintained otherwise. The three projects, being built on tributaries of Chenab river, are in the pre-construction/under-construction stages.

Pakal Dul and Lower Kalnai are being built in Jammu and Kashmir at a cost of Rs 7,464 crore (November 2008 price level) and Rs 396 crore respectively.
Miyar hydroelectricity project, located in Himachal Pradesh’s Lahaul Spiti district, is estimated to cost Rs 1,125 crore.

The Commission, which has officials from both the countries as its members, was set up under the treaty to discuss and resolve issues relating to its implementation.

It is mandatory for the Commission to meet at least once in a fiscal, alternately in India and Pakistan. The PIC had last met in May 2015 here.

India has already downplayed its participation in the meeting, saying it does not amount to “resumption” of government-level Indo-Pak talks.

Declaring that “blood and water cannot flow together,” Prime Minister Narendra Modi had held a meeting in September to review the treaty in the backdrop of the terror strikes, including the Uri attack.

After that meeting, officials had announced that the government has decided to suspend further talks and increase the utilisation of rivers flowing through J&K to fully exercise India’s rights under the pact.

Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.

Top News

Karnataka Govt announces holiday calendar for 2025

K. L. Rahul attributes his success to support from people of Kudla

Life of captive elephant akin to being in Nazi extermination camp: Kerala High Court

Karnataka Cabinet decides to ask Lokayukta SIT to probe mining violations

Karnataka: ”Over 10,800 liquor shops to down shutters on Nov 20 bandh”

Cow smuggler dead, six others injured after their vehicle overturns during police chase

Assam bypolls: Samaguri Cong candidate alleges rigging by BJP, demands repolling

Related Articles More

Maharashtra Elections: EC gets 6,382 complaints of poll code violations; Rs 536cr cash, goods seized

Life of captive elephant akin to being in Nazi extermination camp: Kerala High Court

Cow smuggler dead, six others injured after their vehicle overturns during police chase

Assam bypolls: Samaguri Cong candidate alleges rigging by BJP, demands repolling

Who in Congress has said Article 370 will be restored? Shah spreading lies: Kharge

MUST WATCH

New Technology In Kambala

Lakshdeepotsava 2024 Shree Krishna Mutt

Punganur Cow

Rangoli design

Jagadeesh Nagaraj Kudupali Audio Viral


Latest Additions

Bantwal: Missing elderly man’s body found on railway track at Ullal

Karnataka Govt announces holiday calendar for 2025

K. L. Rahul attributes his success to support from people of Kudla

Karnataka will have a new CM before upcoming Belagavi legislative session begins, claims Sunil Kumar

Maharashtra Elections: EC gets 6,382 complaints of poll code violations; Rs 536cr cash, goods seized

Thanks for visiting Udayavani

You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.