ISRO successfully tests 3D-printed rocket engine – a major breakthrough


PTI, May 11, 2024, 10:27 AM IST

Bengaluru: ISRO has successfully conducted a long-duration test of its PS4 engine, re-designed for production using cutting-edge additive manufacturing (AM) techniques — also known in common parlance as 3D printing — and crafted in Indian industry, the space agency said on Friday.

The new engine, now a single piece, saves 97 per cent of raw materials and reduces production time by 60 per cent, ISRO said.

ISRO achieved the major milestone with the successful hot testing of a liquid rocket engine manufactured through AM technology for a duration of 665 seconds on May 9, a release from the space agency said.

The engine used is the PS4 engine of PSLV (Polar Satellite Launch Vehicle) upper stage.

The PS4 engine manufactured in the conventional machining and welding route has been in use for the fourth stage of PSLV which has a thrust of 7.33 kN in vacuum condition. The same engine is also used in the Reaction Control System (RCS) of the first stage (PS1) of PSLV, the release said.

The engine uses the earth-storable bipropellant combinations of Nitrogen Tetroxide as oxidiser and Mono Methyl Hydrazine as fuel in pressure-fed mode. It was developed by ISRO’s Liquid Propulsion Systems Centre (LPSC).

LPSC redesigned the engine making it amenable to the Design for Additive Manufacturing (DfAM) concept thereby gaining considerable advantages.

The Laser Powder Bed Fusion technique employed has brought down the number of parts from 14 to a single-piece, and eliminated 19 weld joints, saving significantly on the raw material usage per engine (13.7 kg of metal powder compared to the 565 kg of forgings and sheets for conventional manufacturing process) and reduced 60 per cent in the overall production time, the ISRO release said.

The manufacturing of the engine was done in Indian industry (M/s WIPRO 3D), and the engine was hot tested at ISRO Propulsion Complex, Mahendragiri, Tamil Nadu.

As part of the development programme, the injector head of the engine was realised and successfully hot tested earlier. Detailed flow and thermal modelling, structural simulation, and cold flow characterisation of the proto hardware were carried out to gain confidence for the hot test, ISRO said.

Consequently, four successful developmental hot tests of integrated engine were conducted for a cumulative duration of 74 seconds which validated the engine performance parameters.

Furthermore, the engine was successfully tested for the full qualification duration of 665 seconds and observed that all the performance parameters were as expected. It is planned to induct this AM PS4 engine into the regular PSLV programme, ISRO added.

Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.

Top News

100 engineering colleges in Karnataka to be ‘adopted’ by corporates by next year: IT Minister Kharge

Siddaramaiah defends BPL ration card cancellation, says only ineligible beneficiaries affected

China announces new policy measures to protect its exports from Trump’s new tariff threat

Renovated Medical Oncology OPD and Chemotherapy Day Care Centre inaugurated at Kasturba Hospital, Manipal

Karnataka Health Minister justifies revision of user fees in state-run hospitals

Renukaswamy case: Bail hearing for actor Darshan adjourned to Nov 26

Beware of calls asking for pending traffic fines: Bengaluru police

Related Articles More

BTS2024: If India can make rocket sensors, it can also make car sensors, says ISRO chief Somanath

World COPD Day: Know your lung function

SpaceX successfully launches ISRO’s 4,700 kg communication satellite from US

As AI and megaplatforms take over, the hyperlinks that built the web may face extinction

Plastic waste could double by 2050, researchers find, suggest policies to address issue

MUST WATCH

DK Shivakumar

Rose Cultivation

Geethotsava

Naxal Operation

Swimming pool


Latest Additions

100 engineering colleges in Karnataka to be ‘adopted’ by corporates by next year: IT Minister Kharge

Siddaramaiah defends BPL ration card cancellation, says only ineligible beneficiaries affected

China announces new policy measures to protect its exports from Trump’s new tariff threat

Renovated Medical Oncology OPD and Chemotherapy Day Care Centre inaugurated at Kasturba Hospital, Manipal

Kerala HC quashes FIR against Goa Guv over remarks on Sabarimala women entry

Thanks for visiting Udayavani

You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.