Mangaluru: Repair works undertaken at Pumpwell flyover
Team Udayavani, Apr 30, 2020, 2:51 PM IST
Mangaluru: Repair works have been undertaken at Pumpwell flyover after cracks appeared at three places, including the protective wall on the bridge.
The Pumpwell flyover, that inspired several memes took about 10 years for completion, but the cracks appeared just three months after its inauguration.
The cracks started to appear after the unseasonal rains that lashed the city on Saturday, April 25.
Project director Shishu Mohan said hairline cracks appeared as the strengthening of the embankment, protection walls and flyover ramps had to be stopped due to the lockdown.
The district Congress meanwhile has alleged irregularities in the construction of the flyover and urged NHAI officials to conduct a probe.
Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.
Top News
Related Articles More
Father and two sons drown in Ghataprabha river; search operations underway
B’luru: Thief arrested for daylight robbery: Gold and cash worth Lakhs recovered
Puttur: Attempted molestation – Accused sentenced to 2 years behind bars
Kinnigoli: One dead, another injured in two-wheeler collision
Bengaluru: Techie duped of Rs 40 lakh in fake drug case scam
MUST WATCH
Latest Additions
Father and two sons drown in Ghataprabha river; search operations underway
Shinde defends rebellion, claims previous Shiv Sena leadership was anti-development
No urgent hearing on plea against appointment of Rashmi Shukla as DGP: HC
B’luru: Thief arrested for daylight robbery: Gold and cash worth Lakhs recovered
SC issues notice to Centre over vacancies in Debt Recovery Tribunals
Thanks for visiting Udayavani
You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.