MP: 2 engineers suspended, 1 transferred over damage to bridge built under PMGSY
Team Udayavani, Sep 3, 2020, 2:34 PM IST
Image Credit: ANI
Seoni (MP): Days after the overflowing Wainganga river washed away a bridge built over it, under the Pradhan Mantri Gram Sadak Yojana (PMGSY) near Sunwara village here, the CEO of MP Rural Road Development Authority (MPRRDA) suspended two engineers while another has been transferred.
Engineers GP Mehra and his assistant SK Agrawal, who held the posts of general manager and assistant manager were suspended on Tuesday while Sonal Rajak, sub-engineer and in-charge of supervision of the bridge was transferred from Seoni, officials said.
The incident took place on Sunday, August 30.
The 150-metre-long bridge was built on Barabaspur Harduli- Sunwarafor road, some 60 kms away from the district headquarters, with the cost of Rs 3 crore, officials said, adding it was yet to be inaugurated. Construction of the bridge had started two years ago and was completed in the last month.
Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.
Top News
Related Articles More
Notorious gangster wanted in UAPA case arrested at Nepal border
‘Condition critical’, say doctors as farmer leader Dallewal’s fast enters 27th day
ISRO to study how crops grow in space on PSLV-C60 mission
Vandalism at Allu Arjun’s residence in Hyderabad
PM Modi to attend Christmas celebrations hosted by Catholic Bishops’ Conference of India
MUST WATCH
Latest Additions
Kannada Sahitya Sammelana: Food distribution creates stir
Rohit gets hit in nets, practice pitches on slower side
India & Kuwait elevate ties to strategic level; ink defence pact after PM Modi meets top Kuwaiti leaders
In Kuwait, PM Modi meets yoga practitioner, other influencers from Gulf country
Notorious gangster wanted in UAPA case arrested at Nepal border
Thanks for visiting Udayavani
You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.