Shivamogga: 7,300 cusecs water released from Tunga dam
Team Udayavani, Jun 14, 2021, 4:29 PM IST
Shivamogga: An engineer of the Upper Tunga project, Harish informed that 7,300 cusecs of excess water was released on Monday, June 14 from Tunga dam in Gajanuru village of Shivamogga following an increase in water levels due to heavy rainfall.
“Through crest gates, 1,500 cusecs and through the powerhouse, 5,800 cusec water has been released. 21 gates were opened to remove the excess water,” said Harish, an engineer of the Upper Tunga project.
He further said, “Tunga dam which is built across river Tunga in Gajanuru village of Shivamogga had filled up to the brim. The dam was overbrimming due to downpour in its catchments areas in Chikkamagaluru and Shivamogga.”
Comparatively, the Tunga dam is a small one, constructed to provide drinking water to Shivamogga and for canal irrigation of paddy and areca nuts in the region, he added.
Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.
Top News
Related Articles More
Puttur: Two arrested for misconduct under influence of drugs
Kaup: Massive campaign and awareness rally Nov 26 for Constitution protection
Have won in people’s court, says Karnataka CM Siddaramaiah on by-poll results
Ruling Cong sweeps Assembly bypolls in Karnataka, setback to BJP-JD(S) alliance
Karnataka Assembly bypolls victory: Shivakumar gives credit to CM Siddaramaiah’s leadership
MUST WATCH
Latest Additions
Satwik, Chirag doubles pair bows out of China Masters semifinals
Puttur: Two arrested for misconduct under influence of drugs
Kaup: Massive campaign and awareness rally Nov 26 for Constitution protection
Never entered into pact to operate airport in Kenya: Adani
Women centric schemes game-changer for Maharashtra, Jharkhand?
Thanks for visiting Udayavani
You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.