Work on 2nd platform at Kabaka-Puttur railway station

Rs 1.75 crore grant sanctioned

aaron, May 17, 2019, 4:50 PM IST

Puttur: As part of the development work taken at Kabaka-Puttur Railway Station to make it an Adarsha (model) railway station, development work of the second platform is being conducted. The work was sanctioned after a continuous fight by many who fought to achieve facilities at the railway station. MP Nalin Kumar’s effort also led to sanction of the grant. There is a rule that a model railway station must have two platforms. If this work is completed then it will be possible for two trains to stop simultaneously at Kabaka-Puttur railway station.

Rs 1.75 crore has been sanctioned for the work form the union government. Puttur Railway Travellers Association, Kukke Subrahmanya-Mangaluru Railway Users Association and other fighting for facilities at railway station have been continuously pressing for the development of the 2nd platform here. The grant was sanctioned by the union railway minister after the local MP requested for the same.

700 meters long

The second platform is being developed equiv-distant to the first platform for a length of 700mt. mud is being brought in lorries and dumped here for the work. Along with the installation of electricity cables, the platform is being developed through concretization and installation of interlocks. The 2nd platform will be of equal height with the first platform.

Completion by year end

A time period of 6 months has been given to complete the development work of the second platform at Kabaka-Puttur railway station as part of becoming a model railway station. Since work cannot be conducted during the rainy season, the work will be continued post the monsoon. The work will be completed by the year end, inform railway department officials.

Development work

“Various development works have been conducted at the total cost of Rs 2 crore with the identification of Kabaka-Puttur railway station as a model railway station by the union government. Currently, second platform here is undergoing development and is expected to be completed soon,” said Sanjeeva Matandoor, MLA, Puttur

Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.

Top News

Kannada Sahitya Sammelana: Food distribution creates stir

Rohit gets hit in nets, practice pitches on slower side

India & Kuwait elevate ties to strategic level; ink defence pact after PM Modi meets top Kuwaiti leaders

In Kuwait, PM Modi meets yoga practitioner, other influencers from Gulf country

Notorious gangster wanted in UAPA case arrested at Nepal border

Mandhana, Renuka blow away West Indies in first ODI

‘Condition critical’, say doctors as farmer leader Dallewal’s fast enters 27th day

Related Articles More

Kannada Sahitya Sammelana: Food distribution creates stir

Malpe: Carol singing brings Christmas cheer to homes

Take steps to establish NIMHANS and diabetology units in Kalaburagi and Mysuru: CM Siddaramaiah

Puttur: Driver killed after electric auto rickshaw overturns

We have evidence of BJP MLC Ravi using invective inside K’taka Legislative Council: CM Siddaramaiah

MUST WATCH

Tulunadu Daivaradane

Feeding Birds with Creative Paddy Art!

Areca Nut

HOTEL SRI DURGA BHAVANA

Harish Poonja


Latest Additions

Kannada Sahitya Sammelana: Food distribution creates stir

Rohit gets hit in nets, practice pitches on slower side

India & Kuwait elevate ties to strategic level; ink defence pact after PM Modi meets top Kuwaiti leaders

In Kuwait, PM Modi meets yoga practitioner, other influencers from Gulf country

Notorious gangster wanted in UAPA case arrested at Nepal border

Thanks for visiting Udayavani

You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.